| Nuclear-powered ballistic
missile submarines Project 667B MurenaNATO:
Delta I Ñlass Completed 18
units Ships Project 667
Name |
Yard ¹ |
Laid Down |
Launched |
Commissioned |
Note |
Severnoe mashinostroitel`noe
predpriyatie, Severodvinsk – 10 units |
K-279 | ¹310 |
30.03.1970 | 20.12.1971 |
27.12.1972 | |
K-447 |
¹311 | 18.03.1971 |
31.12.1972 | 30.09.1973 |
from 2000 - K-447 Kislovodsk | K-450 |
¹312 | 30.07.1971 |
15.04.1973 | 29.12.1973 | |
K-385 |
¹324 | 20.10.1971 |
18.06.1973 | 30.12.1973 | |
K-457 |
¹325 | 31.12.1971 |
25.08.1973 | 30.12.1973 | |
K-465 |
¹326 | 22.03.1972 |
2.12.1973 | 30.09.1974 | |
K-460 |
¹337 | 5.06.1972 |
7.02.1974 | 20.09.1974 | |
K-472 |
¹338 | 10.08.1972 |
26.04.1974 | 14.11.1974 | |
K-475 |
¹339 | 17.10.1972 |
25.06.1974 | 23.12.1974 | |
K-171 |
¹340 | 24.01.1973 |
4.08.1974 | 29.12.1974 | |
Shipyard named after Leninskogo
komsomola, Komsomolsk-on-Amur – 8 units |
K-366 | ¹221 |
6.03.1973 | 8.06.1974 |
30.12.1974 | |
K-417 |
¹222 | 9.05.1974 |
6.05.1975 | 20.12.1975 | |
K-477 |
¹223 | 5.12.1974 |
13.07.1975 | 30.12.1975 | |
K-497 |
¹224 | 21.02.1975 |
29.04.1976 | 31.10.1976 | |
K-500 |
¹225 | 25.07.1975 |
14.07.1976 | 19.12.1976 | |
K-512 |
¹226 | 21.01.1976 |
26.09.1976 | 18.08.1977 |
from 28.10.1988 - K-512 70 let VLKSM, from 15.02.1992 - K-512 |
K-523 | ¹227 |
1.07.1976 | 3.05.1977 |
30.10.1977 | |
K-530 |
¹228 | 5.11.1976 |
23.07.1977 | 28.12.1977 | |
General characteristics - Project
667B
Displacement (tons): | Surfaced: | 8900 |
Submerged: | 11000 |
Dimensions (m): | Length: | 139 |
Beam: | 11,7 |
Draught: | 8,4 | Speed
(knots): | Surfaced: | 16 |
Submerged: | 25 |
Range: | Unlimited |
Diving depth (m): | Operational: | 320 |
Maximum: | 400 |
Endurance (days): | 70 |
Propulsion: | 2x90 MW OK-700
nuclear reactors, 2x20000 hp GTZA-635, 2 fixed pitch propellers, 2x306 hp PG-153
electric motors, 2x3000 kW OK-2A turbine-type generators, 2x460 kW diesel-generators
| Armament: |
D-9 missile complex (12 R-29ballistic missiles launchers (4K75)) (K-523, 530 –
D-9D missile complex (R-29D missiles (4K75D))) 4 533 mm bow torpedo tubes
(12 SET-65, SAET-60, 53-65K, 53-65M torpedoes) 2 400 mm bow torpedo tubes
(4 SET-40 torpedoes or 8 MG-44 Korund-1 torpedo decoy) | Electronics: |
MRK-50 Kaskad radar complex,
MRP-10M Zaliv-P reconnaissance radar, Zavesa-P,
MGK-100 Kerch sonar, GISZ MG-43 Gorizont,
MVU-106 Almaz-B combat information control
system, Tobol-B navigation complex, Molniya-L
communications complex |
Complement: | 120
(37 officers) | Schematics
Nuclear-powered ballistic missile submarine - Project 667B
Modernizations On K-450, 460, 472, 475, 497, 500, 512 missile
complex D-9 was replaced by D-9D (R-29D missiles (4K75D)) On K-450 Molniya-L
communications complex was replaced by Molniya-LM1
Fleets Northern Fleet: Ê-171 (from 6.05.1976 Pacific
Fleet), 279, 385, 447, 450, 457, 460, 465, 472, 475, 497 (from 30.08.1977
Pacific Fleet) Pacific Fleet: Ê-366, 477, 500, 512, 523, 530
Hull Numbers K-279: 836(1991) K-447: 806(1991), 831(1999)
K-450: 847(1991) K-457: 823(1991), 809(1999) K-460: 824(1991) K-465:
819(1991) K-475: 802(1991), 818(1995) K-477: 223(1996) Ê-497: 902(1990)
K-500: 917(2000) K-512: 900, 226(1996) K-530: 910(1999)
Decommissioned 1992 – K-279 (14.03) 1993 – K-366 (28.09),
K-450 (30.06) 1994 – K-385 (30.11), K-465 (25.01) 1995 – K-171 (28.03),
K-417 (12.01), K-460 (28.03), K-472 (28.03), K-475 (28.03), K-477 (28.03), K-497
(28.03), K-512 (28.03), K-523 (28.03) 1999 – K-457, K-530 2004 – K-447
(5.03), K-500? Export --- | |