| | Nuclear-powered ballistic
missile submarines Project 667BD Murena-MNATO:
Delta-II Ñlass Completed 4
units Ships Severnoe mashinostroitel`noe
predpriyatie, Severodvinsk
| Name |
Yard ¹ |
Laid Down |
Launched |
Commissioned |
Note |
| K-182 |
¹341 | 10.04.1973
| 12.01.1975 |
30.09.1975 | from 4.11.1977
- K-182 60 let Velikogo Oktyabrya, from 3.06.1992 - K-182 | |
K-92 | ¹342 |
9.07.1973 | 3.05.1975 |
17.12.1975 | |
| K-193 |
¹353 | 3.09.1973 |
1.07.1975 | 30.12.1975 |
| | K-421 |
¹354 | 30.11.1973 |
1.07.1975 | 30.12.1975 | |
General characteristics - Project
667BD
| Displacement (tons): | | Surfaced: | 10500 |
| Submerged: | 13600 |
| Dimensions (m): | | Length: | 155 |
| Beam: | 11,87 |
| Draught: | 8,6 | | Speed
(knots): | | Surfaced: | 14 |
| Submerged: | 24 |
| Range: | Unlimited |
| Diving depth (m): | | Operational: | 320 |
| Maximum: | 400 |
| Endurance (days): | 80 |
| Propulsion: | 2x90 MW OK-700
nuclear reactors, 2x20000 hp GTZA-635, 2 fixed pitch propellers, 2x306 hp PG-153
electric motors, 2x3000 kW OK-2A turbine-type generators, 2x460 kW diesel-generators
| | Armament: | D-9D
ballistic missiles complex (16 R-29D missiles launchers (4K75D)) 4 533 mm
bow torpedo tubes (16 SET-65, SAET-60M, 53-65K, 53-65M torpedoes) 2 400 mm
bow torpedo tubes (4 SET-40 torpedoes or 6 MG-44 Korund-1 torpedo decoy) |
| Electronics: | MRK-50 Kaskad
radar complex, MRP-10Ì Zaliv-P ESM radar system, MGK-100 Kerch sonar complex,
MVU-106 Almaz-B combat information control system, Tobol-B navigation complex,
Molniya-L communications complex | | Complement: | 135
(37 officers) | Schematics 
Nuclear-powered ballistic missile submarine - Project 667BD
Modernizations --- Fleets Northern
Fleet: K-92, 182, 193, 421 Hull Numbers K-92:
832(1991) K-182: 890 K-193: 863(1989), 870(1991) K-421: 832, 811(1991)
Decommissioned 1995 – K-92 (28.03), K-182 (28.03), K-193 (28.03),
K-421 (28.03) Export --- | |