Large submarines
Project 877 Paltus
Project 877V
Project 877E
Project 877EKM
Project 08773

Project 636
Project 636M
Project 06361
Project 06363

NATO: Kilo Ñlass


Completed

74 + 6 units


Ships

Project 877 – 22+4 units

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
Shipyard named after Leninskogo komsomola, Komsomolsk-on-Amur – 15+2 units
B-248
¹451
16.03.1980
12.09.1980
31.12.1980
laid down as Project 877E
B-260
¹452
22.02.1981
23.08.1981
30.12.1981
laid down as Project 877E, from 19.03.2006 - B-260 Chita
B-227
¹453
23.02.1982
16.09.1982
23.02.1983
laid down as Project 877E, from 07.2008 - B-227 Vyborg
B-229
¹464
23.02.1983
15.07.1983
30.10.1983
 
B-404
¹465
7.05.1983
24.09.1983
30.12.1983
 
B-405
¹466
20.04.1984
21.09.1984
30.12.1984
from 24.07.1990 - B-405 Tyumensky komsomolets, from 15.02.1992 - B-405
B-470
¹467
6.05.1985
27.08.1985
30.12.1985
 
B-439
¹468
4.04.1986
31.07.1986
30.12.1986
 
B-445
¹469
21.03.1987
26.09.1987
30.01.1988
from 5.04.2006 - B-445 Svyatitel` Nikolay Chudotvorets
B-394
¹470
15.04.1988
3.09.1988
30.12.1988
from 30.12.1987 - B-394 Komsomolets Tadzhikistana, from 15.02.1992 - B-394, from 2014? B-394 Nurlat
B-464
¹471
26.05.1989
23.09.1989
30.01.1990
from 27.11.2003 - B-464 Ust`-Kamchatsk
B-494
¹472
5.05.1990
4.10.1990
28.12.1990
from 27.11.2003 - B-494 Ust`-Bol`sheretck
B-187
¹473
7.05.1991
5.10.1991
30.12.1991
from 15.05.2015 - B-187 Komsomolsk-on-Amur
B-190
¹474
8.05.1992
25.09.1992
30.12.1992
from 11.12.2007 - B-190 Krasnokamensk
B-345
¹475
22.04.1993
6.10.1993
22.01.1994
from 2009 - B-345 Mogocha
B-
-
-
-
-
not completed
B-
-
-
-
-
not completed
Krasnoe Sormovo Shipyard, Gorky - 7+2 units
B-401
¹601
6.10.1982
5.03.1984
30.09.1984
from 18.07.1998 - B-401 Novosibirsk
B-402
¹602
24.08.1983
23.09.1984
30.12.1984
from 3.03.1997 - B-402 Vologda
B-808
¹605
29.09.1986
30.07.1988
27.12.1988
from 16.09.1999 - B-808 Yaroslavl`
B-800
¹606
5.03.1987
7.05.1989
30.09.1989
from 24.07.1990 - B-800 Vologodsky komsomolets, from 15.02.1992 - B-800, from 31.05.2003 - B-800 Kaluga
B-459
¹608
25.02.1988
29.04.1990
28.09.1990
from 2.08.1997 - B-459 Vladikavkaz
B-471
¹609
26.10.1988
22.09.1990
28.12.1990
from 06.2001 - B-471 Magnitogorsk
B-177
¹610
3.11.1989
27.07.1991
26.12.1991
from 12.2000 - B-177 Lipetck
B-
¹612
-
-
-
on scrap 1994
B-
¹613
-
-
-
on scrap 1994

Project 877V – Krasnoe Sormovo Shipyard, Gorky – 1 unit

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
B-871
¹607
17.05.1988
10.09.1989
30.11.1990
from 5.01.2004 - B-871 Alrosa, pump jet propulsion

Project 877E – Krasnoe Sormovo Shipyard, Gorky – 1 unit

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
B-351
¹603
29.09.1984
7.06.1985
29.11.1985
laid down as Project 877

Project 877EKM – 18 units

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
Krasnoe Sormovo Shipyard, Gorky (from 1992 Krasnoe Sormovo Shipyard, Nizhny Novgorod) - 8 units
B-801
¹401
6.04.1984
20.09.1985
29.09.1985
 
B-806
¹403
15.10.1984
30.04.1986
25.09.1986
then - B-806 Dmitrov
B-861
¹404
14.02.1985
26.07.1986
29.11.1986
 
B-890
¹405
19.06.1985
18.04.1987
2.09.1987
 
B-386
¹411
26.07.1986
10.07.1987
5.11.1987
 
B-803
¹412
15.05.1986
15.04.1988
15.08.1988
 
B-185
¹413
23.03.1989
31.05.1994
15.11.1994
 
B-188
¹414
18.11.1990
31.03.1995
15.08.1995
 
Leningradskoe Admiralteyskoe ob`edinenie, Leningrad (from 1992 Admiralteiskie Verfi, St. Petersburg) – 10 units
B-888
¹01307
29.05.1983
29.07.1985
25.11.1985
 
B-898
¹01309
1.04.1986
27.07.1986
25.11.1986
 
B-860
¹01311
15.05.1987
13.09.1987
25.12.1987
 
B-804
¹01313
20.04.1988
16.08.1988
29.11.1988
 
B-468
¹01315
5.04.1989
26.08.1989
30.10.1989
 
B-597
¹01317
6.04.1990
27.07.1990
27.10.1990
 
B-175
¹01319
5.04.1991
25.09.1991
25.12.1991
 
B-224
¹01321
30.04.1992
16.10.1992
31.12.1992
 
B-220
¹01323
5.02.1992
12.07.1994
2.09.1996
 
B-582
¹01325
16.02.1995
26.06.1997
2.10.1997
 

Project 08773 – Admiralteiskie Verfi, St. Petersburg – 1 unit

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
B-477
¹01618
12.12.1998
14.10.1999
16.05.2000
 

Project 636 – Admiralteiskie Verfi, St. Petersburg – 2 units

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
B-
¹01616
16.06.1996
26.04.1997
26.08.1997
 
B-
¹01327
28.08.1997
18.06.1998
25.10.1998
 

Project 636M – 8 units

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
Admiralteiskie Verfi, St. Petersburg – 5 units
B-
¹01329
19.10.2002
27.05.2004
10.12.2004
 
B-
¹01330
19.10.2002
19.08.2004
30.04.2005
 
B-
¹01331
7.03.2003
24.02.2005
15.06.2005
 
B-
¹01332
11.08.2003
26.05.2005
14.09.2005
 
B-
¹01333
7.05.2003
26.08.2005
30.05.2006
 
Krasnoe Sormovo Shipyard, Nizhny Novgorod - 1 unit
B-340
¹611
5.02.1992
8.05.2004
8.08.2005
laid down by Project 877
JSCo PO Sevmash, Severodvinsk - 2 units
B-
¹701
29.05.2003
4.06.2005
17.11.2005
 
B-
¹702
29.05.2003
17.07.2005
24.11.2005
 

Project 06361 – Admiralteiskie Verfi, St. Petersburg – 10 units

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
B-
¹01336
29.04.2007
20.11.2008
31.03.2010
 
B-
¹01337
27.12.2007
9.04.2009
27.07.2010
 
B-
¹01339
24.08.2010
28.08.2012
3.04.2014
 
B-
¹01340
28.09.2011
28.12.2012
3.04.2014
 
B-
¹01341
28.03.2012
28.08.2013
1.08.2015
 
B-
¹01342
23.10.2012
28.03.2014
1.08.2015
 
B-
¹01343
1.07.2013
28.12.2014
30.07.2015?
 
B-
¹01344
28.05.2014
28.09.2015
12.2016?
 
B-
¹01346
2016
14.03.2017
04.2018?
 
B-
¹01347
2016
29.06.2017
09.2018?
 

Project 06363 – Admiralteiskie Verfi, St. Petersburg – 11+2 units

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
B-261 Novorossiysk
¹01670
20.08.2010
28.11.2013
21.08.2014
 
B-237 Rostov-on-Don
¹01671
21.11.2011
26.06.2014
29.12.2014
 
B-262 Stary Oskol
¹01672
17.08.2012
28.08.2014
2.07.2015
 
B-265 Krasnodar
¹01673
20.02.2014
25.04.2015
5.11.2015
 
B-268 Veliky Novgorod
¹01674
30.10.2014
18.03.2016
25.10.2016
 
B-271 Kolpino
¹01675
30.10.2014
31.05.2016
22.11.2016
 
B-274 Petropavlovsk-Kamchatsky
¹01614
28.07.2017
28.03.2019
25.11.2019
 
B-603 Volkhov
¹01615
28.07.2017
26.12.2019
24.10.2020
 
B-602 Magadan
¹01616
01.11.2019
26.03.2021
5.10.2021
 
B-588 Ufa
¹01617
01.11.2019
31.03.2022
16.11.2022
 
Mozhaysk
¹01618
23.08.2021
27.04.2023
28.11.2023
 
B-610 Yakutsk
¹01619
23.08.2021
plan 2024
plan 2024
under construction
Petrozavodsk
¹01620
-
-
-
under construction


General characteristics - Project 877

Displacement (tons):
Surfaced:2325
Submerged:3075
Dimensions (m):
Length:72,6
Beam:9,9
Draught:6,6
Speed (knots):
Surfaced:10,7
Submerged: 18
Range:
Surfaced: 
Under snorkel:6880 nmi (7 knots)
Submerged:400 nmi (3 knots)
Diving depth (m):
Operational:240
Maximum:300
Endurance (days):45
Propulsion:1x5800 hp PG-141M electric motor, 1x150 hp PG-142 electric motor, 1 fixed pitch propeller (Project 877V – 1 pump-jet), 2x1500 kW 4DL-42M diesel-generators (on earlier submarines - 2x1000 kW)
Armament:

8õ1 9K310 Igla-1 SAM system launchers (9M313 missiles) – not on Project 08773
6 533 mm bow torpedo tubes - 18 torpedoes (53-65K, 53-56B, 53-56BA, SET-53M, TEST-71M, USET-80, MG-74 Korund-2 torpedo decoy (Project 877EKM – 53-65KE, TEST-71ME, Project 08773, 636M 53-65KE, TEST-71ME – torpedoes, 3M-54E anti-ship guided missiles)) or 24 DM-1 mines

Electronics:

MRK-50 Kaskad radar complex (Project 877EKM – MRK-50E Kaskad), MRP-25 reconnaissance radar (Project 877EKM – MRP-25E), Khrom IFF, MGK-400 Rubikon sonar complex (Project 877EKM – MGK-400E Rubikon), MG-519 Arfa mine detection sonar , MG-512 Vint self-cavitation measurement sonar, MG-53 noise detection sonar, MG-553 Shkert, MGS-30, MVU-110 Uzel combat information control system, Andoga navigation complex

Complement:60 (16 officers)

General characteristics - Project 636

Displacement (tons):
Surfaced:2350
Submerged:3100
Dimensions (m):
Length:73,8 (Project 06363 – 74,5)
Beam:9,9 (max - 12,8) (Project 06363 – 9,9(max –12,8))
Draught:6,6 (Project 06363 – 6,2)
Speed (knots):
Surfaced:12
Submerged: 19,8
Range:
Surfaced: 
Under snorkel:7500 nmi (7 knots)
Submerged:400 nmi (3 knots)
Diving depth (m):
Operational:240
Maximum:300
Endurance (days):45
Propulsion:1x5800 hp PG-141M electric motor, 1x150 hp PG-142 electric motor, 1 fixed pitch propeller, 2x1500 kW 4DL-42M diesel-generators
Armament:

8õ1 9K310 Igla-1 SAM system launchers (9M313 missiles)
6 533 mm bow torpedo tubes - 18 torpedoes 53-65K, 53-56B, 53-56BA, SET-53M, TEST-71M, USET-80, MG-74 Korund-2 torpedo decoy (Project 636M, 06361 – 53-65KE, TEST-71ME torpedoes, Club-S missile complex (3M-54E anti-ship missiles), Project 06363 – Kalibr-PL missile complex (6? 3M54K, 3M14K missiles) or 24 DM-1 mines

Electronics:

MRK-50 Kaskad radar complex, MRP-25 ESM radar system, Khrom-M IFF, MGK-400 Rubikon sonar complex ¹01339-01344 – MGK-400V1 Rubikon), MG-519 Arfa mine detection sonar, MG-512 Vint self-cavitation measurement sonar, MG-53 noise detection sonar, MG-553 Shkert, MVU-110EM Uzel combat information control system, Andoga navigation complex

Complement:60 (16 officers)

Schematics

Large submarine - Project 877
Large submarine - Project 877


Modernizations

On B-187in 2010, on B-800 in 2002-9.07.2013 MGK-400 Rubikon sonar complex replaced by MGK-400V1 Rubikon, MVU-110 Uzel combat information control system replaced by MVU-110EM Uzel, Andoga navigation complex replaced by Andoga-M
Unrealized modifications: Project 877B; Project 877EK – export variant


Fleets

Baltic Fleet: B-175, 188, 220, 224, 340, 351, 386, 468, 477, 582, 597, 803, 804, 806, 860, 861, 888, 890, 898, ¹01327, 01329-01333, 01336, 01337, 01339-01344, 01616
Black Sea Fleet: B-177 (from 1991 Nothern Fleet), 237 Rostov-on-Don, 261 Novorossiysk, 262 Stary Oskol, 265 Krasnodar, 268 Veliky Novgorod, 271 Kolpino, 459 (from 1991 Northern Fleet), 471 (from 1991 Northern Fleet), 800 (from 1991 Northern Fleet), 801, 871
Northern Fleet: B-185, 401, 402, 808, ¹701, 702
Pacific Fleet: B-187, 190, 227 (from 14.02.1986 Baltic Fleet), 229, 248, 260, 274 Petropavlovsk-Kamchatsky, 345, 394, 404, 405, 439, 445, 464, 470, 494, 588 Ufa, 602 Magadan, 603 Volkhov, Mozhaysk


Hull Numbers

B-177: 599(1991), 429(1999)
B-187: 529(1994)
B-190: 521(2000)
B-220: 481(1996)
B-227: 469(1998)
B-229: 500(2000)
B-237 Rostov-on-Don: 475(2015), 556(3.02.2016)
B-274 Petropavlovsk-Kamchatsky: 456(2020)
B-248: 536(2000)
B-260: 504(2000)
B-261 Novorossiysk: 468(2014), 555(3.02.2016)
B-262 Stary Oskol: 481(2016), 560(2016)
Á-265 Krasnodar: 482(2015), 562(2017)
B-268 Veliky Novgorod: 476(2016), 567(2019)
B-271 Kolpino: 485(2017), 570(2019)
B-345: 507(2000)
B-394: 522(2000)
B-401: 400(1991), 440(1999), 403(2000)
B-402: 418(1991), 462(2000)
B-404: 524(2000)
B-405: 535(2000)
B-439: 545(2000)
B-445: 531(2000)
B-459: 593(1990), 431(1994)
B-464: 547(2001)
B-470: 541(2000), 520(2006)
B-471: 597(1990), 409(2000)
B-477: 470(2000)
B-494: 506(1992), 549(2000)
B-582: 477(1997)
B-588 Ufa: 490(2022)
B-602 Magadan: 458(2022)
B-603 Volkhov: 473(2022)
B-800: 594(1990), 468(2000)
B-806: 440(2000), 487(2000)
B-808: 446(1991), 443(2000), 425(2011)
B-871: 596(1990), 554(1993)
Mozhaysk: 451(2024)
¹01327: 466(1998)
¹01329: 462(2004)
¹01330: 464(2005)
¹01332: 472(2005)
¹01336: 468(2008)
¹01337: 472(2008)
¹01339: 470(2013)
¹01346: 462?(2017)
¹01347: 467?(2017)
¹01616: 466(1997)


Decommissioned

2001 – B-248 (3.05)
2002 – B-229 (10.04), B-404 (10.04), B-405 (10.04)
2005 – B-439 (3.12), B-470 (22.06, sunk as target 24.09.2007)
2012 – B-401 (1.12)
2016 – B-260 (26.04), B-402 (26.11)
2018 – B-227 (planned as an exhibit of the Marine branch of the Patriot Park, Kronstadt)
2020 – B-445?
2021 – B-345 (29.05)
2023 – B-190 (1.09)


Export

Algeria: 6 units
Rajs Hadi Mubarek 012 (till 15.09.1987 B-861), El Hadi Slimane 013 (till 12.1987 B-386), Messali el Hadj 021 (till 31.03.2010 ¹01336), Akram Pacha 022 (till 27.07.2010 ¹01337), Ouarsenis (till 22.09.2018 ¹01346), Hoggar 032 (till 20.11.2018 ¹01347)

Vietnam: 6 units
Hanoi HQ-182 (till 3.04.2014 ¹01339), Thanh pho Ho Chi Minh HQ-183 (till 3.04.2014 ¹01340), Hai Phong HQ-184 (till 1.08.2015 ¹01341), Khanh Hoa HQ-185 (till 1.08.2015 ¹01342), Da Nang HQ-186 (till 2016 ¹01343), Ba Ria-Vung Tau HQ-187 (till 2016 ¹01344)

India: 10 units
Sindhughosh S55 (till 30.04.1986 B-888), Sindhudhvaj S56 (till 12.06.1987 B-898) decomm. 16.07.2022, Sindhuraj S57 (till 20.10.1987 B-890), Sindhuvir S58 (till 26.08.1988 B-860), Sindhuratna S59 (till 22.12.1988 B-803), Sindhukesari S60 (till 16.02.1989 B-804), Sindhukirti S61 (till 4.01.1990 B-468), Sindhuvijay S62 (till 8.03.1991 B-597), Sindhurakshak S63 (till 24.12.1997 B-582) sank in 06.2017 (till 19.07.2000 B-477). Modernization under Project 08773 into the Zvezdochka, Severodvinsk - S55 30.08.2002-18.10.2005, S59 4.06.2000-12.09.2002, S62 4.06.2005-6.08.2008, S63 in 3.08.2010-26.01.2013, Admiralteiskie Verfi, St. Petersburg - S57 in 1999-2001, S60 in 1999-2001, Hindustan Shipyards - S61 in 11.2005-04.2016. On S63 installed the Indian developed USHUS sonar

Iran: 3 units
Tareq 901 (till 21.11.1992 B-175), Noor 902 (till 6.06.1993 B-224), Yunes 903 (till 25.11.1996 B-220). Planning modernization on Project 08773

China: 12 units
Yuanzheng 64 364 (till 15.12.1994 B-185), Yuanzheng 65 365 (till 5.09.1995 B-188), Yuanzheng 66 366 (till 12.11.1997 ¹01616), Yuanzheng 67 367 (till 2.12.1998 ¹01327), Yuanzheng 68 368 (till 10.12.2004 ¹01329), Yuanzheng 69 369 (till 5.05.2005 ¹01330), Yuanzheng 70 370 (till 10.2005 ¹01331), Yuanzheng 71 371 (till 10.2005 ¹01332), Yuanzheng 72 372 (¹01333 30.05.2006), Yuanzheng 73 373 (till 10.2005 B-340), Yuanzheng 74 374 (till 22.12.2005 ¹701), Yuanzheng 75 375 (till 12.2005 ¹702)

Myanmar: 1 unit
Minye Theinkhathu (till 24.12.2019 India S58)

Poland: 1 unit
Orzel 291 (till 21.06.1986 B-351)

Romania: 1 unit
¹609, from 2.06.1991 Delfinul 521 (till 19.09.1986 B-801)

 
   