| Nuclear-powered submarines
Project 945 Barrakuda Project
945A Kondor Project 945AB
MarsNATO: Sierra I Ñlass NATO:
Sierra II Ñlass NATO: Sierra III Ñlass
Completed 4
+ 2 units Ships Project 945 -
Krasnoe Sormovo named after A.A.Zhdanova, Gorky (from 1992Krasnoe
Sormovo, Nizhniy Novgorod) - 2 units
Name |
Yard ¹ |
Laid Down |
Launched |
Commissioned |
Note |
K-239 |
¹3001 | 20.07.1979 |
29.07.1983 | 29.09.1984 |
from 3.06.1992 - B-239, from 6.04.1993 - B-239 Karp |
K-276 | ¹3002
| 21.04.1984 |
26.07.1986 | 27.10.1987
| from 3.06.1992 - B-276, from 6.04.1993
- B-276 Krab, ñ 15.11.1996 - B-276 Kostroma | Project 945A
- Krasnoe Sormovo named after A.A.Zhdanova, Gorky (from 1992Krasnoe
Sormovo, Nizhniy Novgorod) - 2 units
Name |
Yard ¹ |
Laid Down |
Launched |
Commissioned |
Note |
K-534 |
¹3003 | 15.02.1986 |
8.07.1989 | 26.12.1990 | from
3.06.1992 - B-534, from 6.04.1993 - B-534 Zubatka, from 3.04.1996 - B-534 Nizhniy
Novgorod | K-336 |
¹3004 | 29.07.1989
| 28.07.1992 |
14.12.1993 | from 3.06.1992
- B-336, from 6.04.1993 - B-336 Okun`, from 3.04.1996 - B-336 Pskov |
Project 945AB - Krasnoe Sormovo named after A.A.Zhdanova,
Gorky (from 1992Krasnoe Sormovo, Nizhniy Novgorod) - 0+2 units
Name |
Yard ¹ |
Laid Down |
Launched |
Commissioned |
Note |
K-536 |
¹3005 | - |
- | - | scrap
in 1994 | K- |
¹3006 | 1989
| - |
- | not completed |
General characteristics - Project
945
Displacement (tons): | Surfaced: | 6170
(Project 945A – 6466) | Submerged: | 8200
(Project 945A – 8500) | Dimensions (m): |
Length: | 107,16 (Project
945A – 110,62) | Beam: | 12,28
(Project 945A – 12,28) | Draught: | 9,62
(Project 945A – 9,5) | Speed (knots): |
Surfaced: | 12,2 (Project
945A – 14) | Submerged: | 35
(Project 945A – 32,8) | Range: | Unlimited |
Diving depth (m): | Operational: | 480 |
Maximum: | 600 |
Endurance (days): | 100 |
Propulsion: | 1x190 MW OK-650B-3
nuclear reactor (K-534 – OK-650M.01, K-336 – OK-650M.02), 1x50000 hp OK-9D GTZA,
1 fixed pitch propeller, 2x400 hp electric motors, 2 thrusters, 2x3200 kW turbine-type
generators, 2x500 kW diesel generators (Project 945A – 1x800 kW diesel generator) |
Armament: | 4 650 mm bow
torpedo tubes (12 65-73, 65-75 torpedoes, URPK-7 Veter (86R, 88R anti-submarine
guided missiles)) – not on Project 945A 4 533 mm bow torpedo tubes (28 USET-80,
TEST-71M, VA-111 Shkval, URPK-6 Vodopad-PL (anti-submarine guided missiles
83R, 84R) torpedoes, MG-74 Korund-2 torpedo decoy) (Project 945A – 6 533 mm
bow torpedo tubes (36 USET-80, TEST-71M, VA-111 Shkval torpedoes, missile complex
3K10 Granat (3M10 cruise missiles), URPK-6 Vodopad-PL (83R, 84R anti-submarine
guided missiles), MG-74 Korund-2 torpedo decoy)) SAM 9K34 Strela-3 (12
9M36 missiles) (Project 945A – 9K38 Igla (12 9M39 missiles)) |
Electronics: | MRKP-58 Radian
radar complex (K-336 – MRKP-59 Radian-U), MRP-21 reconnaissance radar (Project
945A – MRP-23), MGK-500 Skat sonar complex (Skat-KS, MG-519M Arfa-M, MG-512
Vint-M, GISZ Zhgut-M, MG-518 Sever systems) (Project 945A – MGK-540 Skat-3
(MG-519 Arfa, MG-512 Vint-M, GISZ MG-543, MG-518 Sever systems)), SOKS (Project
945A), MVU-132 Omnibus-5 combat information control system, Simphoniya-U navigation
complex, Molniya-MTs communications complex (K-336 – Molniya-MTsM) |
Complement: | 61 (31 officers)
(then 67 (31 officers)) (Project 945A – 65 (33 officers)) (then 71) |
Schematics
Nuclear-powered submarine - Project 945
Modernizations On K-276 in 2003? added SOKS search system On
K-336 in 2013? MGK-540 Skat-3 sonar complex was replaced by Kizhuch sonar
complex Project 945M - plan 2 units: K-239 in 2015-2017, K-276. Kizhuch sonar
complex Unrealized modifications: Project 945B
Fleets Northern Fleet: K-239, 276, 336, 534
Hull Numbers K-239: 667(1990), 669(1995), 622(1998) K-276:
668(1990), 618(2000), 648(2005) K-336: 879(2000), 663(2007) K-534: 666(1991),
807(2000), 602(2010) Decommissioned ---
Export --- | |