| Destroyers Project
30KNATO: Ognevoy
Class Completed 10
units Ships Project 30K
Name |
Yard ¹ |
Laid Down |
Launched |
Commissioned |
Note |
Zhdanov Shipyard ¹190, Leningrad
– 2 units | Otlichny |
¹538 | 2.12.1939 |
7.05.1947 | 31.10.1948 |
Since 14.03.1960 - CL-69, since 6.04.1962 - PKZ-43 |
Obraztcovy | ¹539 |
2.12.1939 | 30.10.1947 |
29.09.1949 | Since 20.08.1959
- CL-41, since 6.02.1960 - UTS-251 |
Zhdanov Shipyard ¹190, Leningrad, commisioned by Marti Shipyard
¹194, Leningrad – 2 units | Otvazhny |
¹540 | 30.12.1939 |
2.01.1948 | 2.03.1950 | |
Odarenny |
¹541 | 30.12.1939 |
27.12.1948 | 28.06.1950 |
Since 18.04.1958 - UTS-86 | 51
Kommunara Shipyard ¹200, Nikolaev – 1 unit |
Ozornoy | ¹1087 |
20.11.1939 | 25.12.1940 |
9.01.1949 | |
Shipyard ¹402, Molotovsk
– 2 units | Osmotritelny |
¹103 | 5.05.1940 |
24.08.1944 | 29.09.1947 | Since
18.04.1958 - PKZ-151, since 9.05.1958 - CL-30, since 17.09.1958 - PKZ-151 |
Okhotnik |
¹104 | 25.06.1940 |
19.07.1947 | 29.09.1948 |
Since 1.12.1946 - Stalin |
Shipyard ¹199, Komsomolsk-on-Amur – 3 units |
Vnushitelny |
¹3 | 16.10.1940 |
14.05.1947 | 29.12.1947 | Since
18.04.1958 - CL-32, since 14.09.1959 - UTS-90 |
Vinoslivy | ¹4 |
29.10.1940 | 17.11.1947 |
5.12.1948 | Since 20.02.1959
- CL-51 | Vlastny |
¹5 | 29.10.1940 |
15.06.1948 | 27.12.1948 |
Since 20.02.1959 - CL-48 | Laid down by Project 30.
General characteristics - Project 30K
Displacement (tons): | Standard: | 2125 |
Full load: | 2860 |
Dimensions (m): | Length: | 117 |
Beam: | 11 |
Draft: | 4,44 | Speed
(knots): | 35,3 | Range: | 3950
nmi (14 knots), 3500 mni (15,5 knots) | Autonomy
(days): | 10 | Propulsion: | 2x27000
hp, 2 fixed pitch propellers, 2x100 kW turbine-generators, 2x50 kW diesel-generators
| Armament: | 2x2
130 mm B-2LM guns (600 rounds) - Redan fire-control system 1x2 85 mm 92K guns
(600 rounds) - Vympel fire-control system 6x1 37 mm 70K guns - 6300 rounds
3x2 12,7 mm DSHK-2 (Vlastny, Vnushitelny, Vinoslivy - 3õ2 12,7 mm Colt-Brawnin)
2x3 533 mm TTA-53-30K torpedo tubes - 6 torpedos 2 BMB-1 (22 charges)
2 bomb-release gears 52 KB-Krab mines or 60 M-26 mines | Electronics: |
Guys air-search radar system, Rif surface radar system, Rym navigation system,
Fakel IFF, Tamir-5N sonar | Complement: | 301
(20 officers) | Schematics
Destroyers - Project 30K
Modernizations Target
ships: CL-30 (Osmotritelny), CL-32 (Vnushitelny), CL-41 (Obraztcovy) 20.02.1959,
CL-48 (Vlastny), CL-51 (Vinoslivy), CL-69 (Otlichny) 6.02.1960 Training stations:
ÓUTS-86 (Odarenny) 28.04.1958, UTS-90 (Vnushitelny) 28.08.1959, ÓÒÑ-251 (Obraztcovy)
30.12.1959 Floating barracks: PKZ-43 (Otlichny), PKZ-151 (Osmotritelny)
Unrealized modifications: Project 30A - with American turbines
Fleets Baltic Fleet: Obraztcovy, Odarenny, Otvazhny, Otlichny
Black Sea Fleet: Ozornoy Northern Fleet: Osmotritelny, Okhotnik
Pacific Fleet: Vlastny, Vnushitelny, Vinoslivy
Hull Numbers Vnushitelny: 47?(1958) Vinoslivy: 87 Odarenny:
13?(1955), 23, 38(1955), 43(1956), 44, 62, 365, 374 Osmotritelny: 27(1955)
Otvazhny: 65, 38(1955) Otlichny: 23(1953), 44, 71 Okhotnik: 17(1958)
Decommissioned 1958 – Otvazhny (18.03), Okhotnik (3.04) 1960
– Vlastny (30.08), Vnushitelny (29.09), Vinoslivy (30.08) 1961 – Obraztcovy
(23.02), Osmotritelny (15.05, as target ship 6.11.1961 by missile from Grozny
guided-missile cruiser) 1965 – Odarenny (27.02), Otlichny (13.07)
Export Bulgaria: 1 unit Georgiy Dimitrov (to 25.03.1950
Ozornoy), from 30.09.1960 training ship, decomissioned 14.05.1961 | |